Handover is where a good build gets judged

A construction project can go well for months and still be remembered for the day it was handed over dusty. Post-construction cleaning is the last thing anyone plans and the first thing the client sees — and it’s routinely underestimated, because the amount of residue a finished build produces is genuinely surprising.

Construction dust is fine, pervasive, and it does not settle on a convenient schedule. It is in the vents, on the ledges above the sightline, in the tracks of every window that was installed. Clean the visible surfaces once and it reappears within days, because it’s still falling out of the air.

Why this is three phases and not one visit

Rough clean. After the trades finish and before finishing work begins: gross debris removal, bulk dust, making the space workable. Everything downstream is faster because of it.

Interim clean. Through finishing and installation, keeping the site controlled while fixtures, flooring and joinery go in. This is where new surfaces start needing protection rather than just cleaning.

Final detail. The presentation-level pass — adhesive residue, sticker marks, grout haze, paint specks, glass, tracks, every surface at handover standard.

Compressing this into one visit is the most common way post-construction cleaning fails. The final detail ends up absorbing rough-clean work, the crew runs out of hours, and the punch list gets written by the client instead of by you.

Protecting what was just installed

Every surface in a new build is at its most valuable and most vulnerable on the day it’s finished. The wrong product on a new floor finish, an abrasive pad on new stainless, a scratched pane — these are defects the builder inherits, and they cost more than the entire cleaning contract.

We identify new surfaces at the assessment, match products to them, and protect what’s already done as later phases run.

Ready to hand over, with a record

The final walkthrough is documented area by area. Your project manager gets a record to hand over rather than an assurance, and if something is contested later, there’s a document with dates.

Once the space is occupied, the recurring scope takes over under janitorial services — with the new floors and surfaces going onto a preventive cycle from day one, which is when it’s cheapest to start.

How you verify it

Delivered is not the same as proven

Every service below reports into CleanVision, so the work leaves a record you can audit — not a promise you have to trust.

  • Phase sign-off

    Each phase is inspected and signed before the next begins — so the final detail starts from a known state rather than absorbing the previous phase's misses.

  • Punch-list ready

    The final walkthrough is documented area by area, giving your project manager a record to hand over rather than a verbal assurance.

  • Damage-aware

    New surfaces are identified and protected. A finish scratched during the clean is a defect the builder inherits, and we'd rather not create one.

Common questions

Earlier than most people do. Booking only the final detail means that phase absorbs work it wasn't scoped for, and the schedule slips at the worst moment. A rough clean after the trades finish makes everything downstream faster and cheaper.